Remove all doors and windows from the boxes;
Posted: Mon Feb 17, 2025 9:48 am
alignment of the distortion of the entire box along the perimeter;
treatment of wood with chemicals against decay;
complete or partial replacement of the foundation.
Such large-scale work is carried out within 1-2 weeks, involving the entire family and several invited specialists.
Preparing for the lifting of the structure
Before lifting the house, it is necessary to carry out actions physician data ensure ease of lifting and further repairs. This is done to ensure a safety net in case of sudden and unforeseen destruction of the building. It is necessary to do the following:
dismantle the outgoing sewer pipes;
disconnect the power line;
turn off the gas pipeline (if any);
cut off the heating pipes from the boiler and disassemble the chimney;
take out all the furniture;
reject or cut down interfering trees and bushes.
In many houses, the floor is built on logs, which have their own columnar foundation. The walls of this structure are connected to the floor only by baseboards, which will also have to be removed. In addition, the upper crowns, to which the rafters are attached, must be well connected to each other with reliable 50 mm thick planks or bars, so that the roof does not move apart. You also need to separate the veranda, attached to the wall.
When everything is ready, suitable jacks for wooden houses are selected. For ordinary standard buildings with a total area of 60 to 100 square meters, hydraulic jacks with a lifting capacity of 5 to 10 tons are quite suitable. At least 2 of them are needed. Such lifts are always available to drivers of heavy trucks.
Prepare wooden pallets at least 50-80 mm thick, on which the jacks for lifting and steel plates for the heads of these devices will be installed. In the center of them there should be a small depression, preventing the jack from slipping.
treatment of wood with chemicals against decay;
complete or partial replacement of the foundation.
Such large-scale work is carried out within 1-2 weeks, involving the entire family and several invited specialists.
Preparing for the lifting of the structure
Before lifting the house, it is necessary to carry out actions physician data ensure ease of lifting and further repairs. This is done to ensure a safety net in case of sudden and unforeseen destruction of the building. It is necessary to do the following:
dismantle the outgoing sewer pipes;
disconnect the power line;
turn off the gas pipeline (if any);
cut off the heating pipes from the boiler and disassemble the chimney;
take out all the furniture;
reject or cut down interfering trees and bushes.
In many houses, the floor is built on logs, which have their own columnar foundation. The walls of this structure are connected to the floor only by baseboards, which will also have to be removed. In addition, the upper crowns, to which the rafters are attached, must be well connected to each other with reliable 50 mm thick planks or bars, so that the roof does not move apart. You also need to separate the veranda, attached to the wall.
When everything is ready, suitable jacks for wooden houses are selected. For ordinary standard buildings with a total area of 60 to 100 square meters, hydraulic jacks with a lifting capacity of 5 to 10 tons are quite suitable. At least 2 of them are needed. Such lifts are always available to drivers of heavy trucks.
Prepare wooden pallets at least 50-80 mm thick, on which the jacks for lifting and steel plates for the heads of these devices will be installed. In the center of them there should be a small depression, preventing the jack from slipping.