To confirm the right to own a garage, the owner must:

Latest collection of data for analysis and insights.
Post Reply
zihadhosenjm40
Posts: 524
Joined: Sat Dec 21, 2024 3:31 am

To confirm the right to own a garage, the owner must:

Post by zihadhosenjm40 »

To do this, he must register the ownership of the property by paying a share contribution.

Contact the chairman of the garage cooperative and request a certificate from him confirming the payment of the share contribution to the cooperative in full.
Initiate a meeting of all members of the garage cooperative, at which they must express their consent to the construction of an additional building.
Contact the BTI with documents to register the entire garage.
Go to Rosreestr and register the ownership of the garage.
Once the documents for the garage have been completed, it is necessary to nepal mobile database issues related to the construction of an additional building in accordance with the law.

To do this you need:

Inspect the garage. If its design is unreliable, then building an additional superstructure will be a dangerous undertaking. To understand whether it is possible to build a second floor in a garage in a garage cooperative or in a detached garage, it is necessary to seek the services of specialists - designers from an architectural bureau. On site, they will conduct the necessary surveys, tell you whether it is possible to build a second floor or not, and calculate how much the owner will need to build the superstructure.
If the experts have approved the construction of the second floor, then the owner should obtain written permission from the head of the garage cooperative to build the superstructure (if the garage is part of a garage cooperative).
After receiving approval from the head of the GSK, the interested party must contact the local government, namely, the architecture department, to approve the construction project. You must bring documents confirming the right of ownership of the garage, as well as a project for the future two-level premises (it must be ordered in advance from the organization that carried out the garage examination).
If local authorities have given the go-ahead for the construction of an additional floor, then the garage owner can begin construction on his own or with the help of professionals.
Post Reply